Linear Extrapolation Elements were based on taking into consideration the slope in the generate curve at It is long finish and extrapolating out to some theoretical 30-year stage. To make use of the Extrapolation Issue to find out a 30-yr proxy fee, insert the component into the 20-yr Continual Maturity Charge.05, with a total payback level of $1,8